Services
Water & flood risk
Flood risk assessments, hydraulic modelling and drainage design — including the awkward conversation about whether the site is developable at all.
What this involves
- HEC-RAS, Flood Modeller, MicroDrainage
- Models
- BRE 365 tested, never assumed
- Infiltration
- Forty-one, thirty-nine accepted
- FRAs, 2025
- Including two do-not-proceed
- Advice given
A flood risk assessment either supports a planning application or explains why one should not be made, and we will write the second if that is what the modelling says. Two of the eleven sites we assessed in Flood Zone 3 last year we advised our clients not to pursue. Both accepted it; one had already spent £180,000 on an option agreement, which is precisely why the assessment should come before the option and not after.
We build hydraulic models in HEC-RAS and Flood Modeller depending on the reach, and we use the Environment Agency’s own model where a suitable one exists rather than rebuilding it — which is cheaper for you and, more usefully, means the Agency is reviewing a model it already accepts. Climate change allowances are applied to the current guidance and stated explicitly on the plan.
On drainage we design to the non-statutory technical standards with SuDS as the default. Infiltration is tested rather than assumed — a BRE 365 test costs a few hundred pounds and a soakaway designed on an assumed infiltration rate that turns out to be wrong costs a great deal more. Where the ground will not infiltrate we say so early, because it changes the whole drainage strategy and sometimes the layout.
Sectors
Where we do this work
Housing & mixed use
From nine units to 1,400. Most of our work, most of our planning conditions discharged, and where biodiversity net gain bites hardest.
Water utilities
Framework work for two undertakers: treatment works upgrades, storm overflow schemes, and permit variations against an AMP deadline.
Transport & rail
Vegetation clearance ecology, noise and vibration near track, and lineside contaminated land where the ballast has been there since 1898.
Also from Thornfield
Other services
Ecology & biodiversity
Preliminary appraisals, protected species surveys and statutory biodiversity net gain, with the metric run before the layout is fixed rather than after.
Read moreAir quality & odour
Construction dust assessments, road traffic and combustion dispersion modelling, and odour assessment for waste and wastewater.
Read moreAcoustics & vibration
BS 4142 industrial noise, BS 8233 internal levels, construction noise to BS 5228, and vibration to BS 6472 with the measurements to back it.
Read moreGet in touch
Tell us about the site before you buy it
A twenty-minute call at option stage is the cheapest environmental advice you will ever take, and occasionally it is the advice not to proceed.