Services
Land & groundwater
Brownfield land is a risk assessment, not a contamination count. The question is whether a pollutant linkage exists — and often it does not.
What this involves
- Window sample to cable percussion
- Investigation
- MCERTS accredited, UKAS 4287
- Laboratory
- Reports accepted first time, 31 of 34
- Verification
- Two chartered geologists
- Specialists
The commonest expensive mistake on brownfield land is treating a laboratory exceedance as a problem in itself. Contaminated land in England is assessed as a source–pathway–receptor linkage: lead at 900 mg/kg under a slab that is staying put, with no exposure pathway, is not a risk requiring remediation, and we have argued that successfully with three local authorities in the last two years. Digging it out anyway costs money and lorry movements and achieves nothing.
Where a linkage does exist we would rather design around it than excavate it. A capping layer, a gas membrane properly detailed at the service penetrations, or a change to the garden layout will each usually cost less than a dig-and-dump, and dig-and-dump has an embodied carbon cost that nobody used to count and planning authorities increasingly do.
Groundwater work is where the timescales bite. An Environment Agency permit or a hydrogeological risk assessment for a discharge can take three months to determine and longer if the submission is incomplete. We handle the pre-application discussion, and we will tell you at the outset if we think the abstraction or discharge you are planning is unlikely to be permitted.
Sectors
Where we do this work
Housing & mixed use
From nine units to 1,400. Most of our work, most of our planning conditions discharged, and where biodiversity net gain bites hardest.
Industry & manufacturing
Environmental permits, BS 4142 boundary assessments, odour, and the compliance letters that follow an unannounced regulator visit.
Waste & resource
Permit applications and variations, landfill gas risk assessment, and the closure and aftercare plans that outlive everyone who wrote them.
Also from Thornfield
Other services
Ecology & biodiversity
Preliminary appraisals, protected species surveys and statutory biodiversity net gain, with the metric run before the layout is fixed rather than after.
Read moreAir quality & odour
Construction dust assessments, road traffic and combustion dispersion modelling, and odour assessment for waste and wastewater.
Read moreAcoustics & vibration
BS 4142 industrial noise, BS 8233 internal levels, construction noise to BS 5228, and vibration to BS 6472 with the measurements to back it.
Read moreGet in touch
Tell us about the site before you buy it
A twenty-minute call at option stage is the cheapest environmental advice you will ever take, and occasionally it is the advice not to proceed.