Projects
Recent work
Three schemes, written up with the numbers that matter and the part that was difficult. Client names are used where we have permission and withheld where we have not.
Housing
Marlow Reach
A 212-unit scheme that reached 12.4% biodiversity net gain on site by moving a drainage basin at concept stage, and kept an oak that the first layout had removed.
Read more
Energy
Ridgeway Solar
18 MW on a capped 1970s landfill. The gas risk assessment was the whole job; the ecology and glint work took three weeks.
Read more
Water
Kennet storm overflow
Permit variation and WFD assessment for a 14,000 m³ storm tank, delivered against an AMP deadline with four weeks of contingency and no extension of time.
Read moreOn case studies
Why there are only three
We have worked on several hundred schemes since 2011. Three are written up because writing one properly takes a day, requires the client’s agreement, and has to include the part that went badly to be worth reading. A page of forty logos is a page nobody has read.